Salad Cutter Bowl- Chop Fresh Vegetables and Fruits in Seconds

Delivery term:The date of payment from buyers deliver within days
  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Beijing

  • Validity to:

    Long-term effective

  • Last update:

    2017-11-27 03:50

  • Browse the number:

    76

Send an inquiries
+
Semitech Technology Limited
Contactaixin:

Contactaixin:

semitech(Mr.)  

telephone:

Area:

Beijing

Address:

2F/20 Block, Qinghu Industrial Park, Dahe Road, Longhua New District, Shenzhen, Guangdong, China (518109)

Website:

http://semitech.bokess.com/

+
Model Number: SE-SCB-02 Key Specifications/Special Features: Feature:Much easier for useThis is easier than twisting the top part with hand on the marketKeep your counters cleaner and dryer: we made a unique tweak design, which can avoid juice especially like juicy melon spilling out the slide and onto the counterMore sturdy and exquisite base: high quality material ensures its long-time use. Green color looks more beautiful compared with white colorUnique wave-wheel design: compared with other design of the top bowl, makes you more easily and quickly rotate the top partMaking fresh and healthy salad is no longer a chore. Rinse, chop and serve almost any salad in seconds with our ungraded 60s salad makerInstruction:Step 1: put the ingredients into the bowl and wash to clean, make sure the ingredients are no more than 3/4 of the bowl.Step 2: close the bowl and make sure the upper cover is fixed well with the base.Step 3: use a knife to cut the ingredients through the card slot into small pieces to make salad.Step 4: rotate the upper cover 90 degrees and fix again with the base.Step 5: cut the ingredients again in the card slot to make them smaller.
Step 6: done the making. Time enjoy your delicious meal.
Do not put too much ingredients, 3/4 of the bowl is perfect.
Please use the knife with about 18cm to cut.
Shipping Information:
  • FOB Port: Shenzhen
  • Lead Time: 10 - 15 days
Main Export Markets:
  • Asia
  • Australasia
  • Central/South America
  • Eastern Europe
  • Mid East/Africa
  • North America
  • Western Europe